Shore-end Installation

Hong Kong Marine owns and operates a fleet of vessels and deep burial tools that can be mobilized anywhere within Asia to carry out shore-end installation for both large and small diameter submarine cables ranging from 28mm to 220mm overall diameter.

Our fleet includes various types of cable barges as well as anchor-handling tug to suit different operation requirements. Our deep burial tools include a jet sled that is able to achieve 5m burial and a vertical injector that is able to achieve 10m burial.

Shore-end Installation Expertise:

  • Direct Landing Support including Beach Preparation & Submarine Cable Landing
  • Out-Of-Service Cable Route Clearance
  • Cable Detection for both Submarine Power and Fiber Optic Cable
  • Pre-Lay Grapnel Run
  • Fiber Optic Pre-Laid Shore-End Installation
  • Submarine Power Cable Installation
  • Export and Inter-array Submarine Cable Installation for Windfarm
  • Submarine Power and Fiber Optic Cable Diversion
  • Articulated Pipes Installation
  • Post-Lay Burial and Inspections
  • Concrete Mattress and Concrete Slabs Protection